No WestConnex mid-point tunnel site in Leichhardt

smokes_WC1.jpg 

Sign our letter telling the Minister for WestConnex we don't want a damaging and dangerous tunnel site in Leichhardt.

For more details about the proposed mid point tunnel site, please go to http://www.jamieparker.org/tunnel.

Dear Minister

As a member of the local community I believe that the previously proposed Darley Road site is patently unacceptable as a mid point tunnel location for WestConnex.

This mid point tunnel excavation site will remain for up to four years, with significant traffic and safety impacts both on residents and people across the inner west region.

Residents of Leichhardt do not want a drill site. We are highly concerned about the traffic and safety impacts both on local residents and people across the Inner West region. We therefore call on you to cancel any plans to drill at the Darley Road site in Leichhardt. 

This is yet another example of the kind of planning on the run which has been characteristic of the flawed WestConnex project since the start, and one more reason why it should be abandoned.

Yours sincerely,

 

 

 

Can you help further? Please click here for the paper Parliamentary petition to print out and share with your friends and neighbours

 

 

Who's signing

1,359 SIGNATURES
1,000

Will you sign?


Showing 1118 reactions

  • signed 2017-08-11 04:47:19 +1000
  • signed 2017-07-23 23:30:06 +1000
  • signed via 2017-07-09 04:46:02 +1000
  • posted about this on Facebook 2017-07-07 19:32:14 +1000
    Sign the letter: No WestConnex tunnelling sites in Leichhardt
  • signed 2017-07-07 19:31:09 +1000
  • signed 2017-07-02 09:55:34 +1000
    West CONex – is more about supporting the trucking and fossil fuels industry, rather than giving Sydney the transport Systems it so desperately needs.


    West CONex is a 1950’s solution to a 21st century problem and NO WHERE ELSE would that be done- west CONex is the biggest waist of money I have ever heard of.


    SO are the next level of slow ways I have recently heard have been annouced.


    I fully expect this stupid and short term motorway to be full within LESS than 8 years – WHY WAIST SO MUCH MONEY and remove so many homes for such a short sighted project ????


    VERY DISSAPOIONTING – I will NOT and have NOT voted LNP since 2013 and I will NOT be doing so any time soon either
  • signed 2017-06-22 21:23:55 +1000
  • signed 2017-06-20 11:19:40 +1000
  • signed 2017-06-07 19:31:46 +1000
  • signed 2017-06-06 13:23:53 +1000
  • signed 2017-06-05 22:28:24 +1000
  • signed 2017-05-27 10:36:20 +1000
    So wrong!!!
  • signed 2017-04-28 17:53:15 +1000
  • signed 2017-04-28 14:53:41 +1000
  • signed 2017-04-27 08:30:57 +1000
    fresh air is whats needed
  • signed 2017-04-24 14:32:15 +1000
  • signed 2017-04-23 21:10:43 +1000
  • signed 2017-04-23 16:13:41 +1000
  • signed 2017-04-22 19:36:09 +1000
  • signed 2017-04-22 19:13:09 +1000
  • signed 2017-04-22 17:29:32 +1000
    Sam Vallentine
  • signed 2017-04-22 12:22:39 +1000
  • signed 2017-04-22 11:42:01 +1000
  • signed 2017-04-22 11:20:24 +1000
    Bit too late to stop this monster at haberfield; but has to be stopped in leichhardt. Try crossing at the citywestlink and waratah parade; families getting to school, prams, elderly locals, cyclists; it’s a full on construction site ; B Doubles hauling soil from the tunnels, it has to be navigated with pedestrians facing daily changes. We need a temporary bridge to cross safely. It’s a matter of time before someting happens.
  • signed 2017-04-22 11:16:29 +1000
    Goggle pulling out of the White Bay Power Plant renovation shows that the NSW government is blindly going in the wrong direction with WestConnex. Stop WestConnex now.
  • signed 2017-04-22 08:41:58 +1000
  • posted about this on Facebook 2017-04-22 08:19:57 +1000
    Sign the letter: No WestConnex tunnelling sites in Leichhardt
  • signed 2017-04-22 08:18:51 +1000
  • signed 2017-04-22 04:49:31 +1000
  • signed 2017-04-21 23:02:32 +1000